The highest safety standards applied in LNG reloading station of KN

With commissioning works currently in progress at the liquefied natural gas (LNG) distribution station built by KN (AB Klaipėdos nafta), a second LNG truck was accepted today for loading. LNG truck loading operations are in compliance with the highest fire fighting and work safety standards.

”The commissioning works involve several significant stages with one of the most important and the last stage being the LNG reloading to LNG trucks. Thus, we may conclude that the reloading to the…

LNG has been loaded to LNG truck at Klaipeds LNG reloading station for the first time

Liquefied natural gas (LNG) has been loaded to the LNG truck for the first time while performing the commissioning works of the LNG reloading station owned by KN (AB Klaipėdos nafta) in the port of Klaipėda.

On 17 October, the onshore LNG reloading station accepted and loaded the first LNG truck of the Polish company DUON. This operation is unique since it is the first LNG load from the LNG reloading station constructed this year to an onshore vehicle while performing…

Klaipeda LNG Terminal receives the 40th Cargo

Liquefied natural gas (LNG) terminal operated by KN (AB Klaipėdos nafta) receives already the 40th gas carrier since the start of operations of the LNG terminal. It is a small-scale bunkering vessel “Cardissa” and this is the 4th small-scale LNG reloading operation.

The bunker ship “Cardissa” of Shell Western LNG B.V. (Shell) arrived at the port of Klaipėda in the morning of 17 October. The bunker vessel will be filled with 6300 cubic metres of LNG…